Innovative. Practical.
Proven Engineering.
(855) 338-0740
Menu
Close
Home
What We Do
By Core Discipline
Process Engineering
Mechanical Engineering
Structural Engineering
Piping Engineering
Electrical Engineering
Instrumentation & Controls
By Project Phase
Concept Phase
Design Phase
Procurement Phase
Construction Phase
Operations Phase
By Specific Service
Safety
3D Modeling & BIM
Laser Scanning & Point Clouds
Intelligent P&IDs
Plant Commissioning & Startup
Front End Loading (FEL) & Preliminary Studies
See All
How We Work
Delivery Systems
Who We Serve
Why AMG
Project Portfolio
Contact us
(855) 338-0740
About Us
Locations
Resources
Careers
Request a Quote
AMG Engineering Blog
Culture
Case Studies
Process Engineering
Facility Systems
Mechanical
Piping
Electrical
Instrument
All Posts
Alberto G. Mendez
Structure for Large Bulk Material Handling and Storage: Case Study
Meet AMG Custom Controls, LLC
New Automation Solution for CBD Extraction Industry
Ohio Manufacturing Alliance to Fight COVID-19
AMG Inc. COVID-19 Update
Multi-Location Storage Silo Door Investigation: Case Study
40 Years of Engineering Excellence – a Few Words from Our President and Founder
Boiler Feedwater Deaeration: How To Keep Your Steam System Clean, Efficient, Up & Running
Pipe Stress Analysis: How To Get Your Plant Piping Right
12 Critical Considerations When Designing A Bulk Dry Goods Storage System
Industrial Compressed Air Systems: What To Know When Designing A New System
Skim Pit Case
Steam Boiler Systems: What Every Project Engineer Should Know
Soybean Oil Extractor Case Study
Mechanical Conveying Systems 101: What Every Project Engineer Should Know
Team Feature: Tim McCrate
Pneumatic Conveying Systems 101: What Every Project Engineer Should Know
Introducing the New AMG, Inc Brand
Cooling Towers 101: What Every Project Engineer Needs To Know
6 Engineering Costs That Dramatically Affect Process Equipment Scope
HOW TO BUILD AN ACCURATE CONSTRUCTION SCHEDULE TO INSTALL NEW PROCESS EQUIPMENT
Avoid These Common Mistakes When Reviewing Process Equipment Bids
Torsion Ring Case Study
Team Feature: Kevin Croker
Spark Box Case Study
Vibration Resistant Floor Case Study
Team Feature: William Corwin
Engineering Terms & Definitions
Cooling Tower Capacity: Case Study
Ethanol Plant Optimization Beyond Pinch Analysis: Case Study
Solvent Extraction Plant Optimization: Case Study
How to Choose a Good Structural Engineer | Costs & Tips
Central Missouri Project
5 Challenges Every Process Engineering Team Faces—And What To Do About Them
5 More Reasons to Add an Engineering Consultant to Your Process Team
Detailed Engineering: Services & Design Process
Process Engineering: From Concept to Profitability With One Simple Decision
3 Key Excel Features for Powerful Business Financial Data Analysis
7 Questions to Ask to Reality Check a Facility Project Schedule
Key Ways That Construction Type Can Affect Facility Construction Project Capital
A Simple Tool To Predict The Total Cost of a Facility Construction Project
HydroMilling: Process and Benefits
Food Before Fuel Hydromilling
Corn Germ Wet Milling: Process & Benefits
Process Equipment Procurement - The Hidden Schedule Killer
8 Key Facility Capital Cost Factors On Every Industrial Construction Project
Metrics, Metrics, Metrics: How Does Earned Value Management Support Cost & Schedule Control?
Team Feature: Leslie Addison Project Accountant
Team Feature: Mick Leighner CAD Technician
Team Feature: Drew McEnany Structural Engineer
EPA Engineering Guidelines: The Essentials
Food Before Fuel NextGen Technology: How QTI-AMG, LLC is Empowering the Ethanol Industry
Why Every Engineer Should Be Using 3D Laser Surveying
The Significant Impact of Intelligent Process & Instrumentation Diagrams
Plant Project Delivery Options: A Different Perspective
Meet the Recipient of the 2014 AMG Engineering Scholarship
Experience Energy Efficient Lighting Design with LEDs
The Skim Pit Project: A Soybean Facility Case Study
NextGen Frac™ - A New, Transformative Hybrid Fractionation Technology for Corn
Corn Milling: Wet vs. Dry Milling
AMG Improves P&ID Capabilities With Derek Almeida
AMG Team Highlight: AJ Hirsch
Project Highlight - Skim Pit Replacement
AMG's Humble Beginning, Ambitious Outlook
AMG Named in the Top 10 Dayton Engineering Firms
Back to Excerpts