AMG Engineering Blog

Recent Posts

12 Critical Considerations When Designing A Bulk Dry Goods Storage System

12 Critical Considerations When Designing A Bulk Dry Goods Storage System

In many facilities, dry bulk material storage and related handling systems are critical for reliable and efficient plant operations, and in many instances existing systems have been in service for many years.

Read More
Industrial Compressed Air Systems: What To Know When Designing A New System

Industrial Compressed Air Systems: What To Know When Designing A New System

Whether it’s facilitating a process or just powering tools, compressed air is both a useful and ubiquitous utility. Even if you’re already using compressed air, you may need more if you’re increasing automation or planning an expansion.

Read More
Team Feature: Roberto Calderon

Team Feature: Roberto Calderon

Learn about Roberto Calderon!

Read More
Skim Pit Case

Skim Pit Case

To replace an in-ground concrete skim pit in a 9-day window, AMG had to carefully design a plan utilizing atypical construction methods.

Read More
Steam Boiler Systems: What Every Project Engineer Should Know

Steam Boiler Systems: What Every Project Engineer Should Know

Installing a steam boiler system in your facility? Here’s what to avoid (and what to do instead) to achieve a successful install.

Read More
Soybean Oil Extractor Case Study

Soybean Oil Extractor Case Study

A manufacturer of oilseed processing equipment had developed a new line of deep-bed soybean oil extraction machines. The client was seeking help with the structural design of the larger models.

Read More
Page 2 of 12: